Skip to content
بروجيكس — PROJEX

Engineering services for industrial facilities

We carry your factory's licensing file from the first step through to operation.

A factory owner should not have to chase every authority himself. We prepare the documents, follow the inspections, the industrial register and the certificates with the relevant authorities, and hand the file back complete.

Services

Pick the service you need. They are ordered by where your factory stands today: before operating, while operating, or after expanding.

مرحلة ما قبل التشغيل لم تبدأ بعد، أو المصنع تحت الإنشاء. 4
  • الرسومات الهندسية والموافقات المبدئية

    إعداد الرسومات المعمارية والإنشائية للمصنع واستخراج الموافقات المبدئية على البناء وفق اشتراطات الهيئة العامة للتنمية الصناعية.

    Ask about this service
  • موافقة جهاز شؤون البيئة

    إعداد العرض البيئي أو دراسة تقييم الأثر البيئي حسب مسار المنشأة، ومتابعة الموافقة حتى صدورها.

    Ask about this service
  • موافقات الحماية المدنية

    تجهيز ملف الوقاية من أخطار الحريق وأنظمة الإطفاء والإنذار، ومتابعة معاينة الإدارة العامة للحماية المدنية.

    Ask about this service
  • شهادات الإشراف وعقود المقاولات

    شهادة صلاحية المبنى للإشغال من استشاري مقيّد بنقابة المهندسين، وعقود المقاولات والمستندات الهندسية المرتبطة بالتنفيذ.

    Ask about this service
أثناء تشغيل المصنع المصنع يعمل، وتحتاج إلى استيفاء أو تجديد. 3
  • رخصة التشغيل

    استخراج رخصة التشغيل الدائمة أو التصريح المؤقت وفق قانون 15 لسنة 2017، عبر نظام الإخطار أو الترخيص المسبق حسب نشاطك.

    Ask about this service
  • المعاينات واستيفاء الاشتراطات

    تجهيز المصنع للمعاينة، وحضورها، والرد على ملاحظات الجهة واستيفاء ما يُطلب حتى غلق الملف.

    Ask about this service
  • السجل الصناعي والقيد بالغرفة

    القيد الدائم أو المشروط في السجل الصناعي وفق قانون 24 لسنة 1977، وعضوية اتحاد الصناعات المصرية.

    Ask about this service
مرحلة ما بعد التشغيل والتوسع تغيّر نشاطك أو تتوسع في خطوط الإنتاج. 2
  • تعديل النشاط الصناعي وتغييره

    إضافة خط إنتاج أو تغيير النشاط، وتعديل الرخصة والسجل الصناعي معًا حتى يتطابق المستندان.

    Ask about this service
  • تجديد الرخص والسجل والشهادات

    متابعة مواعيد التجديد وتقديم ملفاته قبل انتهاء السريان، حتى لا يتوقف التشغيل بسبب مستند منتهٍ.

    Ask about this service

How it works

Five steps, from receiving the file to handing it back complete.

  1. 01

    File received

  2. 02

    Review

  3. 03

    Submission

  4. 04

    Follow-up

  5. 05

    Handover

Why PROJEX

Every point here is tied to something you can check for yourself on this page.

  • Close tracking of files and procedures

    Five defined steps, from receiving the file to handover.

    See for yourself
  • Document preparation and review

    Seven services covering licences, inspections, the industrial register and certificates.

    See for yourself
  • Solutions matched to each industrial activity

    Including changing and amending an industrial activity and tracking its file.

    See for yourself

FAQ

Common questions about factory licensing and the industrial register.

General answers based on Law 15/2017, Law 24/1977 and the Industrial Development Authority's published service pages — not legal advice. The authority's assessment of each file governs, and procedures and fees may change by later decision.

What is the difference between the notification and prior-licence tracks?

Law 15/2017 sets out two routes. Notification is the default for lower-risk activity. The prior-licence route is mandatory for the establishments named in Article 8 — those posing significant risk to security, health, safety or the environment, plus establishments in geographic areas designated by ministerial decision with cabinet approval. Which route applies determines the shape of the file, so it is the first thing to settle.

How long does licensing take?

Article 10 of Law 15/2017 sets limits on the authority: 14 days to rule on whether the file is complete, 7 days from the end of that period to notify the applicant of any deficiency, and 30 days to decide the licence once the file is complete. The clock starts when the file is complete, not at first contact — so every day a file sits incomplete is a day that does not count.

What happens after the inspection?

There are three outcomes. Conditions met: a licence of unlimited duration. A non-essential condition unmet: a temporary operating permit of one year, renewable but not exceeding three years, while the remainder is completed. An essential condition unmet: refusal, with notice to the investor. Many owners do not know the temporary permit exists.

Environmental statement or environmental impact assessment?

Both belong to the technical and environmental file, and which one applies follows the track: an environmental statement under notification, an environmental impact assessment under prior licensing, submitted in three paper copies and three electronic copies. The second section of the file is waived where an environmental approval already exists.

Who certifies the building fitness-for-occupancy certificate?

A consultant registered with the Engineers Syndicate. The file also carries a fire-prevention report certified by an electrical or mechanical consultant, or a prior civil-defence approval in its place, a valid Federation of Egyptian Industries membership certificate, and a no-objection letter for establishments outside industrial zones that hold no operating licence under Law 453.

Permanent or conditional industrial register?

The industrial register is governed by Law 24/1977. Both entries share the same core documents: a valid commercial register issued within the last six months, a valid tax card, Federation of Egyptian Industries membership, and the most recent industrial register. The conditional entry additionally requires the operating licence issued under Law 15/2017, with the annual follow-up receipt where more than a year has passed.

I want to change or technically modify my factory's activity — what is involved?

Changing an industrial activity affects both the existing licences and the industrial register, so amending a single document is not enough. For technical modifications the authority issues a letter to the General Administration of Civil Protection for an inspection. Work normally starts by reviewing what licences and register entries actually exist before any amendment is filed.

What role do accreditation offices play in issuing an operating licence?

The Industrial Development Authority provides a route for operating licences to be issued through accreditation offices, and publishes an official register of those offices on its site — which any facility owner can check for themselves before engaging anyone.

Contact us

Start your file on WhatsApp, or leave your details and we will call you back.

Start your file on WhatsApp
Phone number
+201121802901
Address
Zahraa Nasr City, Building 2007, Apartment 4, Cairo